Nissan, Daimler to produce engines together

Jan. 9, 2012
In North America

In the latest step forward in the collaboration of the Renault-Nissan Alliance and Daimler, Nissan's Decherd, Tenn., plant will build Mercedes-Benz 4-cylinder engines for Infiniti and Mercedes-Benz starting in 2014.

Nissan and Daimler will produce Mercedes-Benz 4-cylinder gasoline engines together at Nissan's powertrain assembly plant in Decherd, Tenn. Production will begin in 2014, with installed capacity of 250,000 units per year once full ramp-up is achieved.

"This is the newest milestone in our pragmatic collaboration and our most significant project outside of Europe so far," said Renault-Nissan CEO Carlos Ghosn. "Localized capacity reduces exposure to foreign exchange rates while rapidly enabling a good business development in North America - a win-win for the Alliance and Daimler."

The collaboration marks the first production of Mercedes-Benz engines in the North America Free Trade region.

The Tennessee plant's strategic location and logistics links ensure a direct supply of engines starting in 2014 for the Mercedes-Benz C-Class, built at Daimler's vehicle plant in Tuscaloosa, Ala.

"In the context of our Mercedes-Benz 2020 growth strategy, we have decided that we will expand the production capacities required for this close to the customers,” Dr. Dieter Zetsche, Chairman of the Daimler Board of Management and Head of Mercedes-Benz Cars, said. “Through the strategic extension of our cooperation with Renault-Nissan we can realize near-market engine production in the NAFTA region on attractive economic terms and make optimum use of synergies arising from the cooperation.

“Thus, we are systematically broadening our manufacturing footprint in this important growth market."

Nissan began powertrain assembly in Decherd in 1997. Today it manufactures 4-, 6- and 8-cylinder engines for the complete lineup of U.S.-produced Nissan and Infiniti vehicles.

The plant also houses crankshaft forging and cylinder block casting operations.

In 2011, Decherd produced more than 580,000 engines on a covered area of more than 1.2 million square feet.

Sponsored Recommendations

Snap-on Training: Approach to Intermittent Problems

Snap-on's live training sessions can help you develop your own strategy for approaching vehicle repair.

Snap-on Training: ADAS Level 2 - Component Testing

The second video for Snap-on's comprehensive overview of Advanced Driver Assistance Systems (ADAS), covering the fundamental concepts and functionalities essential for automotive...

Snap-on Training: Intro to ADAS

Snap-on's training video provides a comprehensive overview of Advanced Driver Assistance Systems (ADAS), covering the fundamental concepts and functionalities essential for automotive...

Snap-on Training: Guided Component Tests Level 2

The second video for Snap-on's comprehensive overview of Guided Component Tests, covering the fundamental concepts essential for diagnostic procedures.

Voice Your Opinion!

To join the conversation, and become an exclusive member of Vehicle Service Pros, create an account today!