Solar field to power Chevrolet Volt assembly plant

GM, DTE Energy will install array at Detroit-Hamtramck assembly plant

The largest photovoltaic solar array in Southeast Michigan will be built at the General Motors Detroit-Hamtramck assembly plant, turning sunlight into electricity to help power the home of the Chevrolet Volt electric car.

The 516-kilowatt project by GM and DTE Energy will generate electricity capable of charging 150 of the electric cars with extended-range capability every day for a year - a total of 54,750 Volts.

The 264,000-square-foot project is expected to be completed at the end of the summer and will save the facility approximately $15,000 per year over the 20-year easement agreement. The Detroit-Hamtramck facility was chosen because it has available space for the array and because it is home to the Volt.

The Detroit-Hamtramck installation is part of DTE Energy's SolarCurrents pilot that calls for enough photovoltaic systems to be installed on customer property or rooftops during the next five years to generate 15 megawatts of electricity throughout Southeast Michigan. DTE is investing $3 million in the array at Detroit-Hamtramck.

DTE Energy and GM will build the array on a six-acre tract of land located on the south side of the plant. This placement allows it to face true South to maximize solar output.

GM is one of the leading users of renewable energy in the manufacturing sector, deriving energy for manufacturing operations from solar, hydro and landfill gas resources. In the United States alone, 1.4 percent of GM energy consumption comes from renewable resources.

Sign up for our eNewsletters
Get the latest news and updates

Voice Your Opinion!

To join the conversation, and become an exclusive member of Vehicle Service Pros, create an account today!